Plan timing, lead times, trades and details for shower, remodel and commercial glass projects.
Glass is often the last thing to be installed and the first thing that can cause a delay. Because it is made to size after final measurements, it depends on tile, drywall, framing and other trades finishing first. A short planning conversation can save weeks of waiting, avoid measured wrong glass and keep your project moving.
We talk through your project schedule and work backward from the day you want the glass in. We tell you when to measure, when to order and how long fabrication and installation usually take. We explain what other trades need to finish first, and we help you avoid common problems, such as measuring before tile is complete. We write a short plan so everyone knows what happens next.
Glass should be measured after tile, walls and floors are finished. Measuring too soon risks a poor fit.
Custom glass often takes one to three weeks, and special glass or hardware can take longer. We give honest time frames.
We talk with your builder, tile setter, designer or property manager so the glass fits the schedule.
Some glass projects, especially railings and storefronts, may need review. We tell you what to confirm and when.
Measure and order when the site is ready.
You know how long each step may take.
Common scheduling mistakes are avoided.
We talk with your builder, designer or installer.
A simple outline of what happens next.
We flag items you may need to confirm locally.
Every topic has its own page with what to expect and how we approach it.
Topic guideGlass Types and ThicknessAnnealed, tempered, laminated, low-iron, tinted, frosted and insulated glass compared by use, strength and appearance.Learn more
Topic guideShower Door TypesFrameless, semi-frameless, framed, sliding, pivot, bifold and fixed-panel doors compared for look, fit and water control.Learn more
Topic guideGlass Problems and CausesWhy shower doors leak, sag and stick, why windows fog, why mirrors blacken and why glass breaks, with…Learn more Pick the project and options to see a typical sequence from measuring to fabrication to installation, with lead time for custom glass.
You tell us what you want or what is wrong with the glass, and we set an estimate visit that fits your day.
We measure the opening, check walls, curbs and floors for plumb and level and note options for glass, hardware and layout.
You get a plain written scope with glass type, thickness, hardware finish and schedule, and you approve it before anything is ordered.
Glass is cut, polished and tempered to your final measurements, and hardware is ordered to match.
We protect your space, set the glass and hardware, seal it and adjust it until it opens, closes and sits square.
We clean up, walk you through the finished work, fix touch-ups and explain how to care for the glass.
After tile and walls are done and measurements are final. Ordering sooner is risky.
Custom glass often takes one to three weeks. Complex or special glass can take longer.
Yes. We talk with builders and designers to align schedules.
Tell us early. We adjust the plan and the order if the glass has not been made.
Rules vary by project. We help you understand what to check.
Free Glass EstimateA no-obligation visit to measure, look at your project and write a clear scope before any glass is…Explore
Glass Design ConsultationHelp choosing layouts, glass types, hardware finishes and details so your project looks the way you picture it.Explore
Builder and Remodeler Glass ServicesReliable glass scheduling, measuring and installation for builders, remodelers and designers.Explore
Frameless Shower Door InstallationThick, clear tempered glass held by slim hinges and clamps for a clean, open bathroom with no metal…Explore Tell us about your project and we will call you back to set up a visit.
Or call (615) 357-7797 to talk now.